Eskom News
  • About Us
    • Eskom News Editorial Policy
  • Contact
  • Eskom News
  • Opportunities At Eskom
  • Loadshedding schedules
  • News
  • How To
  • Loadshedding
No Result
View All Result
  • About Us
    • Eskom News Editorial Policy
  • Contact
  • Eskom News
  • Opportunities At Eskom
  • Loadshedding schedules
  • News
  • How To
  • Loadshedding
No Result
View All Result
Eskom News
No Result
View All Result
Home Analysis

Eskom’s Abandoned Coal Stations

Syndicated Article by Syndicated Article
December 25, 2024
in Analysis
0
Eskom's abandoned coal stations

By Hügo Krüger Writer, Podcast host and Nuclear Engineer

The South African government has recently released a draft Integrated Resource Plan (IRP) that is accessible through the following link. This document plays a crucial role in shaping the government’s decisions that will go into determining the future fix.

It’s worth reading the IRP document with the background knowledge that Eskom’s current fleet cannot be repaired without taking units offline and therefore they need a safety buffer. Ideally this margine has to be 10% of the totally installed capacity, i.e. 5GW

One noteworthy aspect is the IRP is that it made public the anticipated retirement dates for coal-fired stations. The figure below provides information on the number of decommissioned coal stations that could potentially be revitalized if there is a political will for South Africa to stay with coal for at least another 20 years.

Such a move could alleviate the issue of load shedding and create enough flexibility in the system to facilitate a comprehensive overhaul of the coal fleet.

The list of the abandoned coal stations include:

  • Duvha unit 3

1 x 600 MW

  • Grootvlei Units 4, 5 and 6

3 x 200MW = 600MW

  • Hendrina Unit 1, 3, 8, 9 and 10

3 x 200MW = 600MW

The above coal units amount of 2000 MW of additional power, that’s two stages of load shedding.

What Eskom has to do is send in an engineering team to do an assessment of the status of these units. They can be repaired without imposing an additional stage of load shedding. It would help to create Eskom’s badly needed reserve capacity.

The spare parts can be engineered from South African engineering works if the original supplier no longer has them.

The Komati units 1 – 9, would have added another 1000 MW, but it has now probably been destroyed due to a foolish policy that was lobbied for by the conflicted and undemocratic Presidential Climate Commission.

I emphasize that South Africa should not abandon its coal fleet due to our primary focus on ensuring energy security. Eskom’s leadership and government has to commit in law to fix at least 40 000 MW of coal. To overhaul the entire fleet and maintain it for 2 more cades.

This commitment extends not only to our own needs but also to supporting our neighbors grappling with energy poverty.

South Africa should continue to burn more coal, as we add more generation capacity to the mix, simply because it’s the least constrained of all the 7 energy sources.

We should fix our coal.

This article is republished from Hügo’s Newsletter with permission from the author. Read the original article.

follow Eskom News On Goggle News
Tags: Special Report
ShareTweet
Next Post

Watch- From Coal To Electricity- Inside Kusile One of the World’s Largest Coal Plants

Syndicated Article

Syndicated Article

Syndicated Articles on Eskom News is committed to delivering diverse and comprehensive coverage of energy and environmental topics, drawing from a variety of expert sources and perspectives.The use of syndicated content allows Eskom News to offer a broad range of information and analysis, making it a valuable resource for those interested in energy and environmental issues in South Africa and beyond.

Related Posts

No Content Available
Next Post
Watch- From Coal To Electricity- Inside Kusile One of the World's Largest Coal Plants

Watch- From Coal To Electricity- Inside Kusile One of the World's Largest Coal Plants

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Trending
  • Comments
  • Latest
Eskom's abandoned coal stations

Eskom’s Abandoned Coal Stations

December 25, 2024
Watch- From Coal To Electricity- Inside Kusile One of the World's Largest Coal Plants

Watch- From Coal To Electricity- Inside Kusile One of the World’s Largest Coal Plants

December 25, 2024
SA Announces Procurement of 2500 MW of new generation capacity from nuclear

2 Million South Africans Are Not Paying For Electricity

December 25, 2024
Eskom Saves R16 Billion in Diesel Costs During Summer Maintenance

Eskom Saves R16 Billion in Diesel Costs During Summer Maintenance

December 25, 2024
Eskom's abandoned coal stations

Eskom’s Abandoned Coal Stations

Watch- From Coal To Electricity- Inside Kusile One of the World's Largest Coal Plants

Watch- From Coal To Electricity- Inside Kusile One of the World’s Largest Coal Plants

SA Announces Procurement of 2500 MW of new generation capacity from nuclear

2 Million South Africans Are Not Paying For Electricity

Eskom Saves R16 Billion in Diesel Costs During Summer Maintenance

Eskom Saves R16 Billion in Diesel Costs During Summer Maintenance

Eskom Saves R16 Billion in Diesel Costs During Summer Maintenance

Eskom Saves R16 Billion in Diesel Costs During Summer Maintenance

December 25, 2024
SA Announces Procurement of 2500 MW of new generation capacity from nuclear

2 Million South Africans Are Not Paying For Electricity

December 25, 2024
Watch- From Coal To Electricity- Inside Kusile One of the World's Largest Coal Plants

Watch- From Coal To Electricity- Inside Kusile One of the World’s Largest Coal Plants

December 25, 2024
Eskom's abandoned coal stations

Eskom’s Abandoned Coal Stations

December 25, 2024

Recent News

Eskom Saves R16 Billion in Diesel Costs During Summer Maintenance

Eskom Saves R16 Billion in Diesel Costs During Summer Maintenance

December 25, 2024
SA Announces Procurement of 2500 MW of new generation capacity from nuclear

2 Million South Africans Are Not Paying For Electricity

December 25, 2024
Watch- From Coal To Electricity- Inside Kusile One of the World's Largest Coal Plants

Watch- From Coal To Electricity- Inside Kusile One of the World’s Largest Coal Plants

December 25, 2024
Eskom's abandoned coal stations

Eskom’s Abandoned Coal Stations

December 25, 2024

Daily News On Eskom, Load Shedding and Energy From South Africa From A Data Driven Perspective.

Follow Us

Recent News

Eskom Saves R16 Billion in Diesel Costs During Summer Maintenance

Eskom Saves R16 Billion in Diesel Costs During Summer Maintenance

December 25, 2024
SA Announces Procurement of 2500 MW of new generation capacity from nuclear

2 Million South Africans Are Not Paying For Electricity

December 25, 2024
  • About
  • Advertise
  • Privacy & Policy
  • Contact

© 2023 Eskom News

No Result
View All Result
  • About Us
  • Opportunities At Eskom
  • Analysis
  • Load Shedding Statistics
  • Eskom Safety Tips
  • Contact

© 2023 Eskom News